Lyra (North), Hope Island

Development Type:  Residential Community Title Development

Development Location:  Broadwater Avenue, Hope Island QLD

Pinnacle delivered the preliminary Development Approval (DA) and detailed Operational Works (OPW) civil engineering design and construction of this 66 lot residential community title located at Hope Island QLD.  Pinnacle were responsible for preparing the Development Approval (DA) documentation as well as detailed design documentation gaining Operational Works (OPW) approval from the City of Gold Coast (CoGC) and undertaking the construction contract administration and supervision as well as providing engineering certifications.  This scope of this project included the following:

  • Preparation of Engineering Services Report and Site Based Stormwater Management Plan for the DA phase of the project
  • Coordination with project consultants inclusive of hydraulics, electrical, landscaping and construction contractor
  • Detailed bulk earthworks design and documentation
  • Detailed civil design and documentation inclusive of roadworks and pavements, stormwater drainage (inclusive of dual detention/bio-retention basins), erosion and sediment control plan, sewer and water reticulation as well as signage line marking
  • Gaining OPW approval from CoGC
  • Tendering and contract administration services
  • Construction supervision and inspections
  • RPEQ certification of construction works.